Sale of a hydroelectric power plant
Accepted offer
Transfer of a 265 kW hydroelectric power plant located in the Cantal region.
The plant has a full French ownership rights as regards the water of 283 kW, a head of 5.8 m and an authorised bypass flow of 5 m3/s.
The average annual production is 830 MWh/year for an average turnover of 105 k€/year under EDF H07 contract.
Full ownership.
00995
Sale of an hydropower project.
Access to this sale will be restricted as of the beginning of March
Sale of an ready-to-build hydropower project of 250 kW under prefectural authorisation for a maximum gross power of 283 kW and located in the Ardèche department.
The gross head is of 4.45 m for a derivated flow of 6.48 m3/s.
Forecast average production of 742 MWh for an turnover between 105 ans 115 k€ under EDF H16 OA contract.
The sale includes a dam, the property and the authorisations (water right, building permit).
00885